Cement Floor:

Break through concrete floor with a sledge hammer or a drill, chip a hole to desired size. Dig out under the floor as illustrated to about 3 inches below position of safe. The more reinforced concrete that can be placed around safe, the greater the security. Partially fill hole with concrete mixture and reinforcement, place the safe in the hole, and push the safe down until the top is level with the finished floor. Finish adding the new concrete around the safe. Make sure the top of the safe is kept level with finished floor.

Notes

Remove the safe door during installation and store it out of the way, reinstall after cement is set. Seal the dust cover with duct tape to prevent cement from seeping inside. No additional preparation is required to the body of a Hayman In-Floor Safe. If safe is placed where water might run into it, raise safe slightly above floor level and taper concrete up to dust cover level.

Installation When Pouring New Construction Floor

Order your safe with the Water Resistive Seal for new construction installation. Dig out ground to provide a form as shown for cement floor installation, put safe in position in live concrete in hole and adjust safe to floor level. When safe is locked securely by the setting up of cement, fill remaining hole and finish slab pour.



All-Lock-Rescue Ltd.
Ph#: (780) 447 - 5625
Fax: (780) 488 - 0109
Edmonton, AB, Canada

We accept Visa, Mastercard, and American Express
World wide delivery available!


Back

Home


Comments or Questions? Please E-mail us.

All images and data used with the permission of MEILINK